Full Bathroom Remodel
Down to the studs. New drain and supply lines, Schluter waterproofing, large-format tile, wall-hung toilet and sink.
See the build →From $9,900, fixed in writing. Tile or panel — same crew, same standard: 1/16" joints, dead level, zero lippage. Get close and look at the edges.
Every shower here came out of our 3D builder. It’s open — pick a colour, set the glass and the fixtures, and download your design when it looks right.
Design in 3D
Colours on screen are approximate — check a physical sample before we order.
Fixed price, and the same three people on your job start to finish — a plumber, a tile setter, and Alex on prep and finish.
Full gut remodel — new drain and supply lines, Schluter waterproofing, wall-hung toilet and sink, walk-in shower with sliding glass. Large-format tile, dead level, 1/16" joints.
Some of our work, photographed at every stage — from the bare studs to handover. Acrylic, composite panel or full tile: different budgets, different timelines, the same standard underneath.
Down to the studs. New drain and supply lines, Schluter waterproofing, large-format tile, wall-hung toilet and sink.
See the build →
Old tub out, walk-in shower in. Greenboard, Schluter Kerdi membrane, marble-look tile set with levelers.
See the build →
Marble-look tile floor to ceiling, new tub with sliding glass doors, new vanity and toilet.
See the build →
Old shower out, new valve and supply lines, plywood backing, acrylic pan and walls. Rain head, sliding bar, folding seat and grab bar — finished the same day.
See the build →
Marble-look composite panels over plywood backing, new acrylic tub, recessed niche and a grab bar set into the wall.
See the build →Build your shower in our 3D builder — colour, fixtures, glass, the lot. Free, about a minute, and yours to change as many times as you like.
We call and find a slot that suits you. The estimator comes with material samples, takes every measurement and checks the condition of the room, and confirms your price on the spot, in writing. The visit costs nothing and nothing is signed until you say so.
We agree the start date together once your material lands, and it goes in writing. Panel shower over an acrylic pan: 1–2 days, usable 24 hours later. Tiled wet area: 7–10 days. To the studs: 2–4 weeks.
We walk the finished room together. Get close: the edges, the corners, the grout lines. We don’t call it done — you do.
Free in-home visit, fixed price in writing — or build your shower in 3D right now.