Four Ways We Build It. One Standard.

Shower, tub-to-shower, walk-in, or the whole room down to the studs. Same crew, same 1/16" joints, same fixed price in writing.

Finished Natick shower — black large-format porcelain and hex mosaic pan inside, marble-look walls out, mitered knee-wall cap with no metal trim

Shower Remodeling

A shower is the hardest part of the room to build right and the easiest place to see when it wasn’t. We waterproof the whole assembly over Schluter, then set the tile dead level with 1/16" joints — walls, floor, niche and bench.

Three ways to build it — acrylic or composite panel from $9,900, one to two days, or full tile over Schluter waterproofing in seven to ten. Compare all three. Below is the tile build.

  • Complete tile replacement — floor to ceiling
  • Frameless glass shower doors & enclosures
  • Premium fixtures: rainfall, handheld, multi-function
  • Recessed niches and built-in shelving
  • Waterproof membrane installation
Finished tub-to-shower conversion with a sliding glass door and matte black frame

Tub-to-Shower Conversion

Reclaim the space an underused tub is taking up. We handle every step — tub out, drain relocated, walls waterproofed, tile set. Your bathroom is a working site for seven to ten days and a finished room after that.

  • Complete tub removal and disposal
  • Custom shower pan and drain options
  • Linear drain for a modern seamless look
  • Full tile or solid surface walls
  • All plumbing work included
  • Code compliant — fully permitted
Walk-in shower entry in Natick — sliding glass in a brushed brass frame, floor tile running unbroken to the threshold

Walk-In Showers & Accessibility

Accessible does not have to look clinical. Low-threshold entry, a bench that reads as a design feature, grab bars in the same finish as the rest of the room. Built for the person who needs it now, and for whoever needs it in fifteen years.

  • Low-threshold step-in entry (curbless upgrade available)
  • Grab bars rated for support, set into blocking — in your fixture finish
  • Built-in fold-down shower seating
  • Non-slip textured floor surfaces
  • Handheld showerhead systems
Finished Natick bathroom: wall-hung vanity, mirror and tiled walls after the full remodel

Full Bathroom Remodel

Down to the studs, then back up. New supply and drain lines, new backer board, full waterproofing, tile floor and walls, vanity, lighting, glass. Nothing left from the old room except the space it occupied.

  • Custom vanity and countertop
  • Floor and wall tile selection & installation
  • New lighting, mirrors, and accessories
  • Toilet and plumbing fixtures
  • All electrical and plumbing work
  • Painting and finishing touches

One number, and what’s inside it

You get a fixed price in writing before we start. Here is what it already covers.

In the price

Materials, the permit, debris removal and the licensed plumber — all inside the fixed number. Not line items we add at the end.

You buy nothing

No shopping list, no trips to the tile store, no waiting on your own delivery. We supply it all. The exception is if you want something exclusive — then we build it in.

Ordered and delivered

We order every piece and bring it ourselves. Material usually lands two to four weeks after you sign, and then we call you and pick a date that suits you. No store runs, no waiting on a delivery slot.

Your first day, and every day after

Protection

We cover the floors on the way in and work with the bathroom door shut. Clear your personal things out of the room before we arrive — demolition makes dust, and that is the one thing we cannot cover.

Demolition

The old bathroom comes out and goes into the truck the same day — every piece of it. Water is off for roughly half of this first day, and that is the whole interruption.

The build

Panel shower over an acrylic pan: one to two days, and you can use it 24 hours after we finish. Tiled wet area: seven to ten days. Whole bathroom down to the studs: two to four weeks.

Every evening

We work 8am to 4pm and sweep up before we leave. You get your house back each night, not a building site.

What people ask before they book

What does a bathroom cost?

It depends on how it is built and how big the room is. An acrylic or composite panel shower starts at $9,900 — the two cost the same, the difference is the material. Full tile over Schluter sits above them, and a full bathroom taken to the studs and tiled runs into the thirties. After we measure you get one number in writing — not a range, not an allowance that moves once the wall is open.

What warranty do you give?

Five years on every bathroom we build, written into your contract. On some projects we extend that to a lifetime warranty — where it applies we tell you at the estimate and put the terms in writing, so you are never left guessing. Whatever needs attention, the people who come back are the people who built it.

How long does the work take?

A panel shower over an acrylic pan takes one to two days. A tiled wet area takes seven to ten days. A whole bathroom taken down to the studs runs two to four weeks. You get the schedule in writing before we start.

Is the 3D builder really free?

Yes. It is open to anyone — no account, nothing to install. Build the shower, watch the installed price move as you change things, and email the design to yourself when it looks right. Nothing is owed and nothing is ordered until you have had us out to measure and you have signed.

What is actually behind the surface?

The same thing on every job, whichever finish you pick. The wall comes off, new supply lines go in where they are needed, and the backing is moisture-resistant plywood rather than drywall. A licensed plumber does the plumbing. On tiled jobs the wet area is waterproofed with Schluter before a single tile goes on. The finish — acrylic, composite panel or tile — is what sets your price and your timeline. What is behind it does not change.

How soon can you start?

We meet at your home, agree the price and sign on the spot, and take a deposit. Then your material is ordered. It usually lands in two to four weeks, and once it is in we call you and pick a date that suits you. We deliver everything ourselves — you are not waiting on a store.

When can I use the shower again?

Twenty-four hours after we finish. The crew leaves in the evening and the bathroom is yours the next day.

How long am I without water?

About half of the demolition day. That is the whole interruption — the water is back on before we leave that evening.

Do you take the old bathroom away?

Yes. Everything we tear out goes into our truck the same day. You are not left with a pile in the driveway or a dumpster on your lawn.

What about dust and my things?

We cover the floors on the way in and work with the bathroom door shut. Please clear your personal things out of the room before we arrive — demolition makes dust, and that is the one thing we cannot cover.

Can you do the bathroom floor at the same time?

Yes, and it is the add-on most people take. The room is already stripped, the crew is already there and the tile is already going down in the wet area — carrying it across the rest of the floor is the same crew, the same day, the same delivery. We bring samples to the estimate so you can see the options next to your wall tile, and price it for your room right there.

HIC #218846
Registered & Insured
5 Years
Workmanship Warranty
Fixed Price
In Writing Up Front

Build It Before You Book Us.

Put the shower together on your screen — tile colour, fixtures, glass, niche, bench — and watch the installed price move with every choice. It takes about a minute and costs nothing. When you’re ready, book the free in-home measure — the estimator brings the samples, takes the measurements, and confirms your price on the spot.

Design in 3D

Like what you see?
Let’s talk about your project.

Book a free in-home consultation — or build your shower in 3D and see what it costs.

Design in 3D Free Estimate